WORKS AND TECHINICAL SERVICES

  1. Kyani-Bukonde-Namwiwa road 13kmters

Key observations

Recommendations

  1. Grading was done from kyani-bukonde-Namwiwa
  2. Culvert lines were installed in Ikobero Swamp and Igungwe Swamp
  3. Need to install culvert lines in some spots to control runoff water from damaging the road. 
  4. Ikobero swamp is narrow and the soils are breaking off because it’s a seasonal lake.
  5. The road requires more off shots to direct runoff water.
  6. Full gravelling was done in swamp areas.
  7. Compacting was done along the road.
  1. Install culvert lines in madibira valley to direct runoff water
  2. Lobby for funding to uplift both swamps ( Ikobero and igungwe)
  3. Sensitize the community about the relevance of putting offshoots along the road.
  4. Dig offshoots where necessary